The replacement of Nanaimo Correctional Centre is a purpose-built facility that enhances safety, security, and space to continue successful programs.
The new correctional centre has 200 cells with double occupancy possible, although staff on-site prefer a single use per inmate.
Those housed at the facility are put into three categories: open, medium and secure.
Construction was completed in 2024.