The Interior Heart and Surgical Centre (IHSC) building is a 14,162 m2, that houses a Cardiac and Inpatient Surgical Suite, Cardiac Surgery Intensive Care Unit, Pre- and Post-Operative Care Unit and a new Medical Device Reprocessing department. Located on the Kelowna General Hospital campus, the building is designed to allow for a future additional fourth floor and to achieve Leadership in Energy and Environmental Design (LEED®) Gold certification.
INTERIOR HEART AND SURGICAL CENTRE
- Project Agreement and Schedule 1 – Definitions and Interpretation
- Schedule 2 – Design and Construction Protocols
- Schedule 3 – Design and Construction Specifications
- Schedule 4 – Services Protocols and Specifications
- Schedule 5 – Insurance Requirements
- Schedule 6 – Changes, Minor Works and Innovation Proposals
- Schedule 7 – Lands
- Schedule 8 – Payments
- Schedule 9 – Compensation on Termination
- Schedule 10 – Lenders’ Remedies Agreement
- Schedule 11 – Material Project Contractor Collateral Agreement
- Schedule 12 – Project Co’s Ownership Information
- Schedule 13 – Dispute Resolution Procedure
- Schedule 14 – Records and Reports
- Schedule 15 – Financial Model
- Schedule 16 – Communication Roles
- Schedule 17 – Key Individuals
- Schedule 18 – Completion Documents
- Schedule 19 – Planned Refinancing
Project Agreement Appendices
- Appendix 2A – Independent Certifier Agreement
- Appendix 2B – Not Used
- Appendix 2C – Review Procedure
- Appendix 2D – Not Used
- Appendix 2E – Equipment and Furniture
- Appendix 2F – Initial Project Schedule
- Appendix 2G – Proposal Extracts (Design and Construction)
- Appendix 2G – Proposal Extracts (Part 1 and Part 2)
- Appendix 2G – Part 1: Noise Impact Assessment
- Appendix 2G – Part 1: Emission Summary and Dispersion Modelling Report
- Appendix 2G – Part 1: Project Health, Safety, and Environment Plan
- Appendix 2G – Part 1: Preliminary Project Quality Management System
- Appendix 2G – Part 2: Power Distribution Cut Sheets
- Appendix 2G – Part 2: Luminaire Schedule and Cut Sheets
- Appendix 2G – Part 2: Emergency Generator Cut Sheets
- Appendix 2G – Part 2: Network System Cut Sheets
- Appendix 2G – Part 2: Kohler Power MCP 3000 Cut Sheets
- Appendix 2G – Proposal Extracts (Part 1 and Part 2)
- Appendix 2H – Site Plan
- Appendix 3A – Clinical Specifications and Functional Space Requirements
- Appendix 3E – Cable Infrastructure Standard
- Appendix 3H – IHSC Systems Responsibility Matrix
- Appendix 3I – Room Data Matrix
- Appendix 3J – Site Requirements
- Appendix 3K – IHSC Ergonomic Design Guidelines
- Appendix 4B – Not Used
- Appendix 4C – Handback Requirements
- Appendix 4D – Plant Services
- Appendix 4E – Interface Services
- Appendix 4F – Help Desk Services
- Appendix 4G – Utility Management Services
- Appendix 4H – General Management Services
- Appendix 4I – Environmental and Sustainability Services